2 March 2020|News
SICE wins the contract for the construction of all the technological systems of the new CDM srl headquarters in Cimadolmo (TV). The contract includes a logistic shed of about 10.000 sq m with REI240 structure and compartments all “Seveso” certified for chemical products storage, office building for another 700 sq m and the guardian’s house of about 150 sq m. The shed has a powerful fire-fighting system with 153 foam dispensers of 400 lt/min and 5 bar each with a fire-fighting pressurization group of 3 motor pumps of 360 mc/h flow rate and 9,5 bar of prevalence each, 5.500 lt of foam at high expansion AFFF-AR 3%. The amount of technological systems is over € 1.000.000.